English Ðóññêèé
    Main Page     E-mail     Contacts
 
 
News
[14-01-2010] - SPD 2009 Oil Production
 
In 2009 the total daily production from the Salym oil fields in Western Siberia, developed by Salym Petroleum Development N.V. (SPD), increased 1.2 times compared with 2008 and made 7.65 million tons (55.3 million barrels).

During last year SPD drilled 303 km of wells and completed 103 wells. Average drilling time was 10.48 days with the record well of 4.54 days. Average completion time was 5,48 days.
 Back to News List
INFORMATION
Creation of a site - Perfect-Design.ru
CMS Inlab Smart Web Builder
Copyright © 2004 Salym Petroleum Development N. V.
// Russia, 31, Novinsky blvd, Moscow,
Tel.: +7 (495) 518-97-20,
Email: info@spdnv.ru